Find the public tenders your company can actually win.

BidCaliper reads every federal, Québec, Toronto and Yukon public tender, and the ones you forward it, and checks each one against your trades, certificates, bonding and travel radius. Then it tells you which ones fit, and why.

Start with a 30-day free trial, no card. Plans from $149 a month (CAD).

BidCaliperOpportunitiesWhat's comingCompanyDecision recordYOUR COMPANY

Clear to bid — 2

CLEAR TO BIDBoiler replacement — pump house No. 4

A MUNICIPAL WATER UTILITY · BRANDON, MB · CLOSES IN 11 DAYS

Worth a look — 19

WORTH A LOOKMechanical systems upgrade — administration building

A SCHOOL DIVISION · THE NOTICE DOES NOT SAY WHERE THE WORK IS

WORTH A LOOKDomestic water piping renewal — phase 2

A HEALTH AUTHORITY · BOND SET AS A PERCENTAGE, NO VALUE PUBLISHED

Not open to you — 2,073, each with a reason

NOT OPEN TO YOURoof membrane replacement — six sites

THE WORK IS ROOFING, WHICH ISN'T ON YOUR LIST

NOT OPEN TO YOUWater treatment plant — process piping

MANITOBA WORK AT OR ABOVE $100,000 NEEDS A COR OR SECOR. YOU HOLD NEITHER.

NOT OPEN TO YOUHVAC installation — community centre
TRADE FITHVAC. That is your work.
DISTANCEIn Manitoba, inside your service area.
CERTIFICATEA valid COR or SECOR is required. You hold neither.
“Bidders shall hold a valid Certificate of Recognition (COR) or SECOR issued by a recognised certifying partner.”Instructions to bidders, cl. 4.2
Reading CanadaBuys, SEAO, Toronto and Yukon under open licence/2,094 tenders open on 20 October 2026/57,627 past awards/re-read every 6 hoursWhat we can and can’t reach →

See it in action

BidCaliper in 90 seconds

Tenders checked against your company with the reasons, your part of the specification found, a price drafted at published union rates, bids reviewed and compared, and projects found before they are tendered.

Watch the two-minute walkthrough · Regarder en français

The problem

Most public tenders were never work you could bid

A tender listing doesn’t know your trades, how far you travel, or what your surety will bond. So it sends you everything, and someone spends the morning finding the few worth bidding.

2,073

not open to you, each with a reason

19

worth a look

2

clear to bid today

How this was measured

We ran one company profile, a nine-person Winnipeg mechanical shop working within 1,000 km, through the live product against every open tender we held on 20 October 2026. It is an example, not a customer’s account.

ONTARIOMANITOBAUNITED STATES250 KM SERVICE AREAPortage la PrairieWinnipegyour yardBrandon242 kmKenora229 kmDauphin298 km
Inside your service area
Outside it
Water

Distance is measured by road. Kenora is in Ontario and closer to your yard than Dauphin, which is in Manitoba. BidCaliper measures driving distance from your own base, so your service area can cross a provincial border.

Qualification

Every answer shows the clause it came from

Know why before your estimator spends an hour reading it.

BidCaliperOpportunitiesWhat's comingCompanyDecision recordYOUR COMPANY
NOT OPEN TO YOUWater treatment plant — process piping
TRADE FITProcess piping. That is your mechanical work.
DISTANCEManitoba, inside the area you set.
CERTIFICATEManitoba work at or above $100,000 needs a valid COR or SECOR. You hold neither.
BONDING50% of the published $4,200,000 is $2,100,000. That is over your single-job limit.
INSURANCE$5,000,000 commercial general liability, and yours meets it.
SITE VISITMandatory, in 36 hours.
DEADLINECloses in 11 days.
“Bidders shall hold a valid Certificate of Recognition (COR) or SECOR issued by a recognised certifying partner.”Instructions to bidders, cl. 4.2
It reads what the work isSearch a tender listing for “heating” and most of what comes back is fuel being delivered.
“Not open to you” is still worth readingIt can show you are one certificate away from work you could do.
The mandatory site visitMiss it and you can’t bid, whatever the closing date says.

Addendums

Know what changed, and what it means for your bid

Acknowledge two of three addendums and your bid is thrown out on compliance. Nobody tells you which one you missed.

What the tender said

50% of contract value

Performance bond. Inside your surety’s single-job limit, so it passed.

Addendum 2 changed it

100% of contract value

You see both values, the clause it came from, and which earlier addendum it supersedes.

What it changes in your bid

Check with your surety before you bid

Addendum 2 has been read but not acknowledged. Your priced schedule was built on the drawing it replaced. Both are marked out of date. Nothing is re-priced for you.

Cost and margin

What an hour of your crew actually costs

BidCaliper uses your wages, burden, overhead and productive hours to work out what an hour of your crew really costs. You price jobs against your own number instead of an industry average.

How the cost model works →

Cost per productive hour

$100.72HIGH CONFIDENCE
Labour $73.80
Overhead $26.92

What it was built from

Utilization — how much of a paid week gets billedDEFAULT
Annual overheadYOURS
Blended field wageYOURS
Labour burdenYOURS
Paid hours per headYOURS

Utilization is still on a benchmark default. How much of a paid week your crew bills moves this number more than any other answer.

An example. Yours is built from your own figures.

Preparing the bid

Built from what you’ve already saved

Documents, requirements, addendums and your priced schedule in one place, with anything missing listed. It never sends anything. You sign and send.

Bid workspace

  • Documents
  • Requirements
  • Addendums
  • Priced schedule
  • Notes
  • History
Considering
Preparing
Reviewing
Submitted
Invitation to tender.pdfAUG 24
Specifications — Division 23.pdfAUG 24
Drawings M-201 to M-208.pdfAUG 24
Addendum 1 — acknowledgedAUG 28
Addendum 2 — not acknowledgedSEP 02
COR or SECOR certificate — missing—

Current through addendum 1. Two items still to do, and the priced schedule was built on drawing revision A.

You get a package to sign

Every requirement, document and addendum goes into one package. You are the one who submits it.

Your bid history

See what you’re bidding, what you’ve won, what you’ve lost, and why

Every opportunity you are considering, have submitted, won, lost or passed on. Each one shows who decided, when, and the reason they gave.

Considering

6

Boiler replacement — pump house No. 4

Submitted

3

Awaiting award. Bid validity 60 days.

Won

2

Priced at a 14% margin against our own hourly cost.

Lost

4

Submitted at $214,000. Awarded lower.

No bid

11

Performance bond above our single-job limit.

Example counts. Records are shown as they were saved, not recalculated. Your no-bids are the evidence a COR auditor asks for.

Coverage

What BidCaliper covers today

Most tools like this won’t tell you what they miss.

Where the work isRead automaticallyYou can bring it inWhy
Federal — anywhere in CanadaYes—CanadaBuys, under the Open Government Licence.
Québec — every public bodyYes—SEAO, under Creative Commons Attribution.
Manitoba — province, infrastructure, City of WinnipegNoYesMERX terms forbid copying any of it. Paste in a notice from your own account and we check it like any other.
British ColumbiaNoYesBC Bid excludes automated readers. We follow that.
AlbertaNoYesAlberta Purchasing Connection excludes automated readers.
Ontario, Saskatchewan, Atlantic, the territoriesNoYesWe haven't checked these yet, so we can't say either way.
Federal — all of CanadaAUTOMATIC

CanadaBuys, under the Open Government Licence.

QuébecAUTOMATIC

SEAO, under Creative Commons Attribution.

ManitobaYOU BRING IT IN

MERX terms forbid copying any of it. Paste in a notice from your own account and we check it like any other.

British ColumbiaYOU BRING IT IN

BC Bid excludes automated readers. We follow that.

AlbertaYOU BRING IT IN

Alberta Purchasing Connection excludes automated readers.

Elsewhere in CanadaYOU BRING IT IN

We haven't checked these yet, so we can't say either way.

Federal notices cover work in every province, so a Manitoba job bought federally does reach you. What is missing is provincial and municipal buying outside Québec.

Plans

One job you’d have missed pays for a year

Start with a 30-day free trial of the Bid plan, no card: every tender checked, every answer with its reasons, and your bids prepared. After it, a free account shows your top 2 matches each week. Plans from $149 a month (CAD).

Watch

Find the right opportunities.

$149 /month

  • Every federal, Québec, Toronto and Yukon tender, every six hours
  • Checked against your trades, tickets, bonding and radius
  • Every answer with its clause
  • Unlimited bid packages
RECOMMENDED

Bid

Prepare and keep the bid current.

$449 /month

  • Everything in Watch
  • Addendums tracked: what changed and what is now out of date
  • Upload a takeoff and price it against your own costs

Win

Manage your bidding operation.

$949 /month

  • Everything in Bid
  • Pipeline, win/loss performance, bonding exposure
  • Buyer and competitor history from past awards
  • More than one base, or more than one company
Watch$149/moFind the right opportunities.
RECOMMENDEDBid$449/moPrepare and keep the bid current.
Win$949/moManage your bidding operation.

All prices in Canadian dollars, per month. Cancel and you keep access to the end of the month you have paid for.

Compare the plans in full →

See it against your own company

Set up your trades, your base and your crew. Today’s live tenders are checked while you watch.

May we count this visit? We use Google Analytics on these public pages to see whether contractors are finding us. Nothing inside your account is ever measured. What we hold